Fencing · Project planning
Horizontal Fence Calculator
Count horizontal board rows and one board per row per physical bay. Check stock length against the equalized bay length before ordering.
By Alish Gautam, Software Developer · Updated · Calculation methodology
Start with the editable example below. Dimensions retain their physical size when units change. Region sets currency labels without converting currencies; confirm entered quotes after changing region.
Project takeoff
Whole packages round up. Allowance is separate from purchased surplus. Prices omit labor, delivery, tax and other items unless explicitly entered.
- Total measured fence run
- 100 ft
- Gate openings
- 0 ft
- Net infill length
- 100 ft
- Maximum bay spacing
- 8 ft
- Infill bays
- 13
- Physical posts
- 14
- Horizontal rows
- 13
- Net requirement
- 169 pieces
- Allowance
- 16.9 pieces
- Planned requirement
- 185.9 pieces
- Unrounded package requirement
- 185.9
- Boards / pickets to buy
- 186
- Purchased coverage
- 186 pieces
- Surplus beyond planned requirement
- 0.1 pieces
Supplier-ready material list
- Specified fence / board height
- 6 ft
- line posts
- 12
- end posts
- 2
- corner posts
- 0
- gate posts
- 0
- Boards / pickets to buy
- 186
- Rails to buy
- 43
- Rail installed linear length
- 300 ft
- Fasteners before reserve
- 1,014
Geometry / layout breakdown
| Run | Infill (ft) | Bays | Equal spacing (ft) |
|---|---|---|---|
| Run 1 | 100 | 13 | 7.692 |
A stock board shorter than the bay triggers a warning. No unsupported floating joint or automatic cut reuse is assumed.
How it works
Rows = ceil((height + vertical gap) / (board width + vertical gap)). Boards = rows × bays.
Assumptions and limitations
A stock board shorter than the bay triggers a warning. No unsupported floating joint or automatic cut reuse is assumed.
Whole packages round upward after the chosen allowance. Physical geometry and purchase reserve are separate. Manufacturer and project specifications override editable examples; the selected region does not establish a local code requirement.
Sources and boundaries
This method uses geometric arithmetic and user-entered dimensions. No installation requirement or material property is inferred from a standard.