Fence Post Calculator
Count physical posts across detached runs, connected corners, straight continuations and a closed perimeter. Choose a maximum spacing and see the equal spacing actually produced.
By Alish Gautam, Software Developer · Updated · Calculation methodology
Start with the editable example below. Dimensions retain their physical size when units change. Region sets currency labels without converting currencies; confirm entered quotes after changing region.
Project takeoff
Whole packages round up. Allowance is separate from purchased surplus. Prices omit labor, delivery, tax and other items unless explicitly entered.
- Total measured fence run
- 100 ft
- Gate openings
- 0 ft
- Net infill length
- 100 ft
- Maximum bay spacing
- 8 ft
- Infill bays
- 13
- Physical posts
- 14
Supplier-ready material list
- line posts
- 12
- end posts
- 2
- corner posts
- 0
- gate posts
- 0
Geometry / layout breakdown
| Run | Infill (ft) | Bays | Equal spacing (ft) |
|---|---|---|---|
| Run 1 | 100 | 13 | 7.692 |
The result is a quantity calculation, not a post-spacing or structural specification. Gates at a boundary use the existing terminal node.
How it works
bays = ceil(span / spacing); intermediate posts = bays − 1. Graph nodes deduplicate connected endpoints and classify line, end, corner and gate posts.
Assumptions and limitations
The result is a quantity calculation, not a post-spacing or structural specification. Gates at a boundary use the existing terminal node.
Whole packages round upward after the chosen allowance. Physical geometry and purchase reserve are separate. Manufacturer and project specifications override editable examples; the selected region does not establish a local code requirement.
Sources and boundaries
QUIKRETE: Setting Posts without Mixing
Open the source · Web guidance; edition not stated · Reference checked 2026-10-04
Scope: Manufacturer general post-setting instructions
Used for: One-third to one-half above-ground-height planning reference.
Does not establish: Local frost depth; Wind design; Universal minimum embedment.
Planning guidance must be checked against soil, loads and project requirements.