Direct Unit Conversion Answer

At 4" thickness: 0.333 cu. ft. (0.01235 cu. yds) per square foot.

For every 100 square feet of a standard 4-inch residential patio, you need 1.23 cubic yards (33.33 cu. ft.) of concrete—or 62 bags (80 lb) with a 10% safety buffer.

The Per-Square-Foot Formulas:
Cubic Feet per Sq Ft = Thickness in Inches ÷ 12
Cubic Yards per Sq Ft = Thickness in Inches ÷ 324
80 lb Bags per Sq Ft = (Thickness in Inches ÷ 12) ÷ 0.60 ft³

Interactive Per Square Foot Estimator

Interactive Estimator

Concrete Volume & Coverage Calculator

Convert dimensions, cubic yards, and bags into precise surface coverage and order quantities.

1 Cubic Yard:27 ft³ = 81 sq ft @ 4"
Safety / Waste Buffer
Total Cubic Yards
1.358 yd³
Nominal: 1.235 yd³
Recommended Order
1.5 yd³
Rounded to 0.5 yd³ truck batch
80 lb Bag Count
62 bags
@ 0.60 ft³ yield per bag
60 lb Bag Count
82 bags
@ 0.45 ft³ yield per bag
Surface Area: 100.0 sq ft • Total Volume: 36.67 cu ft

Need project takeoffs for a custom area?

Calculate your exact yardage, bag counts, rebar, and delivered ready-mix costs in our full interactive Concrete Calculator.

Open Concrete Calculator →

Concrete Unit Rate Table: Material Needed for 1 Square Foot

This reference chart displays exact volumetric units and dry bag fractions required to pour 1 single square foot at various slab depths:

Slab ThicknessCubic Feet / sq ftCubic Yards / sq ft80 lb Bags / sq ft60 lb Bags / sq ftArea per 1 Yard³
2 inches (50 mm)0.1667 cu. ft.0.00617 yd³0.278 bags0.370 bags162.0 sq. ft.
3 inches (75 mm)0.2500 cu. ft.0.00926 yd³0.417 bags0.556 bags108.0 sq. ft.
3.5 inches (90 mm • 2×4)0.2917 cu. ft.0.01080 yd³0.486 bags0.648 bags92.6 sq. ft.
4 inches (100 mm • std)0.3333 cu. ft.0.01235 yd³0.556 bags0.741 bags81.0 sq. ft.
5 inches (125 mm)0.4167 cu. ft.0.01543 yd³0.694 bags0.926 bags64.8 sq. ft.
6 inches (150 mm)0.5000 cu. ft.0.01852 yd³0.833 bags1.111 bags54.0 sq. ft.
8 inches (200 mm)0.6667 cu. ft.0.02469 yd³1.111 bags1.481 bags40.5 sq. ft.

Concrete Quantities for Benchmark Project Square Footages (at 4" Depth)

To quickly estimate typical job footprints, use this breakdown for common square footage milestones at a standard 4-inch slab thickness (including a 10% safety buffer):

Surface AreaNominal Volume+10% Order Volume80 lb Bags (+10%)60 lb Bags (+10%)Recommended Batch Order
10 sq. ft. (e.g. small AC pad)0.12 yd³ (3.33 ft³)0.14 yd³ (3.67 ft³)7 bags9 bagsBagged Mix
50 sq. ft. (e.g. small walkway)0.62 yd³ (16.67 ft³)0.68 yd³ (18.33 ft³)31 bags41 bagsBagged Mix
100 sq. ft. (e.g. 10×10 patio)1.23 yd³ (33.33 ft³)1.36 yd³ (36.67 ft³)62 bags82 bags1.5 yd³ Ready-Mix
200 sq. ft. (e.g. 10×20 patio)2.47 yd³ (66.67 ft³)2.72 yd³ (73.33 ft³)123 bags163 bags3.0 yd³ Ready-Mix
400 sq. ft. (e.g. 20×20 garage)4.94 yd³ (133.33 ft³)5.43 yd³ (146.67 ft³)245 bags326 bags5.5 yd³ Ready-Mix
500 sq. ft. (e.g. wide driveway)6.17 yd³ (166.67 ft³)6.79 yd³ (183.33 ft³)306 bags408 bags7.0 yd³ Ready-Mix
1,000 sq. ft. (large flatwork)12.35 yd³ (333.33 ft³)13.58 yd³ (366.67 ft³)612 bags815 bags14.0 yd³ (2 Truckloads)

* For full multi-size slab comparisons, see our guide on concrete needed for a 10×10 slab and common slab sizes.

How Per-Square-Foot Volume Relates to Finished Project Costs

Knowing the concrete volume per square foot allows you to estimate raw material costs versus turn-key contractor installation pricing:

  • Raw Ready-Mix Material Cost: At $150 per cubic yard delivered, concrete material alone costs approximately $1.85 per square foot for a 4-inch slab (0.01235 yd³ × $150 = $1.85) or $2.78 per square foot for a 6-inch slab.
  • Turn-Key Installed Project Cost: Full contractor flatwork (including excavation, compacted crushed stone subbase, formwork lumber, #4 steel rebar reinforcement, pouring, screeding, and broom/trowel finishing) typically ranges from $6.00 to $12.00 per square foot for standard residential flatwork.

For a full breakdown of site prep, labor, and finishing fees, see our comprehensive guide on how much does concrete cost per square foot in 2026.

Frequently Asked Questions About Concrete Per Square Foot

How much concrete do I need per square foot for a 4-inch slab?

For a 4-inch thick slab, each 1 square foot requires 0.3333 cubic feet (1/3 cu. ft.) or approximately 0.01235 cubic yards of concrete. In terms of bagged mix, you need 0.556 of an 80-lb bag per square foot (meaning 1 eighty-pound bag covers 1.80 square feet).

How much concrete is needed per square foot for a 6-inch slab?

For a 6-inch thick slab, each 1 square foot requires exactly 0.5000 cubic feet (1/2 cu. ft.) or 0.01852 cubic yards. In bagged mix, this equals 0.833 of an 80-lb bag per square foot (1 eighty-pound bag covers 1.20 square feet).

How much concrete do I need for 100 square feet?

At a standard 4-inch thickness, 100 square feet requires 33.33 cubic feet (1.23 cubic yards) of concrete nominal volume. With a 10% safety buffer, plan for 36.67 cubic feet (1.36 cubic yards), which equals 62 eighty-pound bags (or 82 sixty-pound bags).

What is the formula for cubic yards per square foot?

The formula is: Cubic Yards per Square Foot = Thickness in Inches ÷ 324. For a 4-inch slab: 4 ÷ 324 = 0.012346 yd³/sq ft.

How many bags of concrete do I need per square foot?

Divide the cubic feet required per square foot by your bag yield: For 80 lb bags (0.60 cu ft yield) at 4" thickness: (4 ÷ 12) ÷ 0.60 = 0.556 bags per sq ft. For 60 lb bags (0.45 cu ft yield) at 4" thickness: (4 ÷ 12) ÷ 0.45 = 0.741 bags per sq ft.